
- Food Processing Facilities
- Food Distribution Facilities
- U.S. Foodservice-Columbia
- Martin Brower - TX
- Reinhart - MA
- U.S. Foodservice-South Florida
- Waugh Foods - IL
- U.S. Foodservice-Atlanta
- Sargento-Plymouth, WI
- Sysco-Idaho - ID
- Performance Food Group-MA
- U.S. Foodservice-Salt Lake
- U.S. Foodservice-Metro NY
- Sysco - PA
- Reinhart - IL
- Sysco - CA
- U.S. Foodservice-Kansas City
- U.S. Foodservice-Connecticut
- U.S. Foodservice-Raleigh
- U.S. Foodservice-Charlotte
- QuikTrip -TX
- Truck Service Centers
- Automated Warehouse Facilities (ASRS)
- Commercial Projects
- Industrial

Design Projects
ESI Design Service professionals will work closely with your project team during the facility planning and design phase to determine your current and future needs. ESI will look not only at your physical building requirements, but also how you operate within those physical constraints. From there ESI will develop a clear, concise and economical design that is in harmony with your operations and needs.
Constructing a building has an immediate impact on the environment, but the continuous operation of that building has extensive long term effects on the environment that far exceed the initial impact. We encourage our clients to consider the use of sustainable products and green building strategies in prudent and environmentally responsible ways. This approach reduces operation costs and environmental impacts, and can increase building resiliency.
Fred Usingers, Inc. - WI
Milwaukee, WI
Project included a new food process center addition to support manufacturing operations for Fred Usinger, Inc., including smoked sausage, cooked meats, slicing/packaging. The facility is designed to support both raw product and frozen product.
Area
| Cooler | 5,107 |
| Packaging | 6,793 |
| Cook area | 4,911 |
| Shipping/receiving dock | 1,171 |
| Compressor room | 760 |
| Support | 7,286 |
| Welfare | 1,633 |
| Warehouse | 21,091 |
| Corridor | 1,466 |
| Office | 1,106 |
| TOTAL AREA SQUARE FOOTAGE | 51,324 |
Facility Features
- Refrigeration system – central ammonia utilizing reciprocating compressors
- Under floor warming – future recirculated glycol utilizing waste heat from refrigeration system
- Wall construction – insulated metal panel
- Roof construction – white genflex TPO mechanically fastened. R-value varies from R-20 to R-50
- Fire protection – combination wet/dry pre-action pipe
- Industrial Refrigeration
- 3/19/12 - 3/21/12
- Frontier Airlines Center Milwaukee, WI
- Booth Number: 135
- Int'l Cheese Tech Expo
- 4/11/12 - 4/12/12
- Frontier Airlines Center Milwaukee, WI
- Booth Number: 259






